Current-limiting fuse time-current characteristics show how operating time changes with current. To read a fuse TCC curve, identify its minimum melting and total clearing boundaries, check the stated test conditions, and confirm the fuse’s interrupting range. For high-current coordination, also use the manufacturer’s I²t data and coordination tables.
Try it with a source: follow the Eaton ELSP curve-reading example below to distinguish fuse ratings from curve readings.
Start with the exact fuse catalog number and curve revision. A curve for another current rating or fuse family is not a substitute, even when the devices have similar dimensions. Check whether the chart shows minimum melting, average melting, or total clearing; these are different characteristics.
The horizontal axis normally shows current in amperes and the vertical axis time in seconds. Read the chart’s labels: current may be expressed as prospective symmetrical RMS current, and some charts use multiples of rated current. Logarithmic axes give equal space to each tenfold change. Do not read the grid as a linear scale or assume that every fuse curve has the same shape.
| 단계 | 확인할 사항 | How to use the result |
|---|---|---|
| 1. Identify the curve | Catalog number, rating, revision and legend | Confirm that the plotted data belongs to the proposed fuse. |
| 2. Choose the current | Current units and the relevant fault or load condition | Locate the current on the horizontal axis without extrapolating beyond published data. |
| 3. Read both boundaries | Minimum melting and total clearing | Read time at each intersection; do not substitute an average line. |
| 4. Check applicability | Interrupting limits, voltage, temperature and preload | Confirm that the reading applies to the installation. |
| 5. Complete coordination | Companion-device curves, I²t and approved combinations | Document the manufacturer’s required margins and conditions. |
For a published curve reference, open Eaton TC132004EN, effective March 2019. Figure 1 on PDF page 2 covers minimum melting; Figure 2 on PDF page 3 covers maximum clearing. Keep both figures available. Before applying this family document to an installed fuse, confirm the complete catalog number, applicable curve and revision with Eaton.
As an identification example, Eaton lists CBUC38065D100 as an under-oil ELSP backup fuse with the following separate ratings:
| Published rating | 가치 | Use in the review |
|---|---|---|
| 전압 | 38 kV | Check the voltage application. |
| 정격 전류 | 65 A | Identify the proposed fuse; this is not its minimum interrupting current. |
| 최소 차단 전류 | 490 A | Check the lower boundary of the stated interrupting range. |
| 최대 차단 전류 | 50 kA | Check available fault current against the applicable rating. |
These are Eaton ratings, not ZeeyiElec specifications or approval of a replacement. Use this sequence with the manufacturer-confirmed curves:
For a coordination calculation, obtain manufacturer curve points or approved software data rather than assigning an exact millisecond value from a small PDF image.
Minimum melting marks the earliest melting boundary under the specified conditions. Total clearing includes the time needed for melting and subsequent arcing until interruption is complete. Their separation is not simply an extra delay that can be assigned to every fuse. Use the published boundaries and tolerance notes for the actual model.
For a conventional selective-coordination comparison in the applicable time-current region, compare the downstream device’s total clearing with the upstream fuse’s minimum melting. Include the manufacturer’s required margin. When the upstream device is a relay and breaker or a recloser, use its appropriate operating and clearing characteristics. Eaton discusses these distinctions in its current-limiting fuse application guide.
These terms answer different questions. The 최소 차단 전류 defines the low end of a fuse’s specified interrupting capability. The current-limiting threshold concerns the onset of current limitation. A melting curve by itself does not establish that a backup fuse can safely interrupt every current that will melt its element.
A backup current-limiting fuse must be coordinated with a device that clears the lower-current range. Do not describe operation below its interrupting rating as equivalent to an expulsion fuse. See our 변압기 백업 보호 가이드 for the protection roles.
As a model-specific example, Eaton’s March 2024 ELSP catalog lists 500 A minimum interrupting capacity for its 15.5 kV, 125 A entry. The 125 A continuous rating and 500 A interrupting minimum are different ratings. This example describes Eaton data, not a Zeeyi product rating or an interchangeability claim. Check the exact catalog number and all table notes in Eaton CA132013EN.
In the current-limiting region, the fuse restricts the fault waveform. A time-current overlay alone cannot describe every aspect of that interruption. Keep these three checks separate:
| Data | Question it answers |
|---|---|
| Time-current characteristic | How does operating time vary with current under the stated conditions? |
| Peak let-through characteristic | What peak current passes during the specified fault condition? |
| Minimum melting and total clearing I²t | What current-squared time integral applies before melting or through interruption? |
I²t is expressed in A²s; it is not an energy value in joules by itself. Use manufacturer data at the applicable voltage and conditions. For fuse-to-fuse selectivity in the current-limiting region, the upstream minimum melting I²t must exceed the downstream total clearing I²t with the manufacturer’s required allowance. Confirm the approved combination rather than relying on a curve intersection or ampere-rating ratio alone. See Eaton’s medium-voltage fuse application guidance.
There is no universal 0.1–0.2 second margin for all current-limiting fuse combinations. Likewise, a generic millisecond clearing time or fixed peak-current reduction cannot replace the selected fuse’s published characteristics.
In a coordinated series arrangement, the Bay-O-Net fuse handles the intended lower-current duty while the backup current-limiting fuse provides high-fault protection. Select the pair as a protection system. Verify low-current coverage, the transition between devices, transformer inrush withstand, and the maximum available fault current.
Use the manufacturer’s pairing tables and their conditions for transformer voltage, capacity and fuse-link type. The backup fuse is intended to operate for severe faults, so keeping it intact for every possible fault is not the goal. Our Bay-O-Net 및 전류 제한 퓨즈 연계 가이드 explains the division of protection duties.
| Error | Better check |
|---|---|
| Using a curve from a similar fuse | Match the complete catalog number and curve revision. |
| Reading minimum melt as completed interruption | Use total clearing for the device expected to clear the fault. |
| Treating a curve endpoint as an interrupting rating | Read the separate minimum and maximum interrupting ratings. |
| Applying one generic inrush multiple | Use transformer-specific inrush information and the applicable selection guidance. |
| Ignoring installation temperature or prior load | Request the manufacturer’s temperature and preload corrections. |
| Treating a conceptual drawing as test data | Use traceable manufacturer curves or tabulated data for the study. |
Send the supplier the transformer kVA, primary and secondary voltages, winding connection, operating frequency, installation medium, expected load and available fault-current range. Identify the companion fuse, relay or recloser, including its settings where relevant.
Request a document package containing the proposed catalog number; voltage and continuous-current ratings; minimum and maximum interrupting ratings; minimum melting and total clearing curves; reference temperature and preload conditions; peak let-through and I²t data; recommended companion devices; and the applicable curve revisions. Ask for digital curve points when available for your coordination software.
Record which documents were used and which assumptions still need confirmation before approving a substitution. A product photo or nameplate rating does not establish coordination. When enquiring about our 전류 제한용 퓨즈, include this information so the required model documentation and application suitability can be confirmed.
시간-전류 특성 곡선은 전류와 퓨즈 작동 시간의 관계를 나타냅니다. 범례를 참고하여 최소 용융 곡선과 총 차단 곡선, 해당 단위 및 기준 조건을 확인하십시오.
최소 용융은 명시된 조건 하에서 가장 먼저 발생하는 용융 경계를 나타냅니다. 완전 소멸에는 용융 및 아크 발생부터 완전한 단절에 이르기까지의 모든 과정이 포함됩니다. 각 조정 점검 시 올바른 경계를 사용하십시오.
전류 제한 영역에서 퓨즈는 전력 주파수 주기보다 짧은 시간 내에 회로를 차단할 수 있습니다. 실제 성능은 퓨즈와 회로에 따라 달라지므로, 일률적인 밀리초 단위의 값보다는 해당 퓨즈의 공시된 차단 시간, 최대 허용 전류 및 I²t 데이터를 참고해야 합니다.
아닙니다. 최소 차단 전류는 지정된 차단 범위의 하한입니다. 전류 제한 임계값은 예상되는 전류 피크를 제한하는 것과 관련이 있습니다. 백업 퓨즈에는 그 차단 범위 이하의 조정된 저전류 보호 기능이 필요합니다.
전류 제한 영역 전반에 걸쳐 적용되는 것은 아닙니다. 제조업체의 호환성 표와 해당되는 최소 용융 및 총 클리어링 I²t 데이터, 그리고 TCC 곡선을 확인하십시오. 해당 소자에 대해 요구되는 여유치와 적용 조건을 준수하십시오.
카탈로그 번호, 곡선 개정판, 정격 전압 및 전류, 최소 및 최대 차단 정격, 최소 용융 곡선 및 총 차단 곡선, 온도 및 예압 기준, 피크 투과 데이터, I²t 데이터, 그리고 권장 호환 장치를 요청하십시오.
주변 온도나 오일 온도, 인클로저 조건 및 사전 부하가 퓨즈의 작동에 영향을 미칠 수 있습니다. 실제 설치 환경에 맞춰 제조업체가 제시한 보정치를 적용해야 하며, 모든 곡선을 일률적인 온도 계수로 일괄 조정해서는 안 됩니다.