Current-limiting fuse time-current characteristics show how operating time changes with current. To read a fuse TCC curve, identify its minimum melting and total clearing boundaries, check the stated test conditions, and confirm the fuse’s interrupting range. For high-current coordination, also use the manufacturer’s I²t data and coordination tables.

Try it with a source: follow the Eaton ELSP curve-reading example below to distinguish fuse ratings from curve readings.

How to Read a Current-Limiting Fuse TCC Curve

Start with the exact fuse catalog number and curve revision. A curve for another current rating or fuse family is not a substitute, even when the devices have similar dimensions. Check whether the chart shows minimum melting, average melting, or total clearing; these are different characteristics.

The horizontal axis normally shows current in amperes and the vertical axis time in seconds. Read the chart’s labels: current may be expressed as prospective symmetrical RMS current, and some charts use multiples of rated current. Logarithmic axes give equal space to each tenfold change. Do not read the grid as a linear scale or assume that every fuse curve has the same shape.

StepWhat to checkHow to use the result
1. Identify the curveCatalog number, rating, revision and legendConfirm that the plotted data belongs to the proposed fuse.
2. Choose the currentCurrent units and the relevant fault or load conditionLocate the current on the horizontal axis without extrapolating beyond published data.
3. Read both boundariesMinimum melting and total clearingRead time at each intersection; do not substitute an average line.
4. Check applicabilityInterrupting limits, voltage, temperature and preloadConfirm that the reading applies to the installation.
5. Complete coordinationCompanion-device curves, I²t and approved combinationsDocument the manufacturer’s required margins and conditions.

Manufacturer TCC example: Eaton 38 kV ELSP

For a published curve reference, open Eaton TC132004EN, effective March 2019. Figure 1 on PDF page 2 covers minimum melting; Figure 2 on PDF page 3 covers maximum clearing. Keep both figures available. Before applying this family document to an installed fuse, confirm the complete catalog number, applicable curve and revision with Eaton.

As an identification example, Eaton lists CBUC38065D100 as an under-oil ELSP backup fuse with the following separate ratings:

Published ratingValueUse in the review
Voltage38 kVCheck the voltage application.
Rated current65 AIdentify the proposed fuse; this is not its minimum interrupting current.
Minimum interrupting current490 ACheck the lower boundary of the stated interrupting range.
Maximum interrupting current50 kACheck available fault current against the applicable rating.

These are Eaton ratings, not ZeeyiElec specifications or approval of a replacement. Use this sequence with the manufacturer-confirmed curves:

  1. Check the interrupting range first. A hypothetical 300 A fault is below this model’s listed 490 A minimum. A melting-time reading would not establish safe interruption there; the protection scheme must cover that lower-current duty.
  2. Use the same current on both plots. For a hypothetical 1,000 A study point, first confirm that the approved curves and application conditions cover it. Follow that current to the matching minimum-melting curve, then read the time. Repeat on the maximum-clearing plot. Do not extrapolate if either plot does not cover the point.
  3. Keep the two readings distinct. Record the minimum-melting time and maximum-clearing time, the curve identifier and graphical reading precision. A rating-range check alone does not approve coordination or establish a current-limiting threshold.
  4. Complete the application checks. Review the original plots’ conditions and tolerance notes, temperature and preload corrections, companion-device requirements, and the I²t and peak let-through data needed for the study.

For a coordination calculation, obtain manufacturer curve points or approved software data rather than assigning an exact millisecond value from a small PDF image.

Minimum Melting vs Total Clearing

Minimum melting marks the earliest melting boundary under the specified conditions. Total clearing includes the time needed for melting and subsequent arcing until interruption is complete. Their separation is not simply an extra delay that can be assigned to every fuse. Use the published boundaries and tolerance notes for the actual model.

For a conventional selective-coordination comparison in the applicable time-current region, compare the downstream device’s total clearing with the upstream fuse’s minimum melting. Include the manufacturer’s required margin. When the upstream device is a relay and breaker or a recloser, use its appropriate operating and clearing characteristics. Eaton discusses these distinctions in its current-limiting fuse application guide.

Minimum Interrupting Current Is Not the Current-Limiting Threshold

These terms answer different questions. The minimum interrupting current defines the low end of a fuse’s specified interrupting capability. The current-limiting threshold concerns the onset of current limitation. A melting curve by itself does not establish that a backup fuse can safely interrupt every current that will melt its element.

A backup current-limiting fuse must be coordinated with a device that clears the lower-current range. Do not describe operation below its interrupting rating as equivalent to an expulsion fuse. See our transformer backup protection guide for the protection roles.

As a model-specific example, Eaton’s March 2024 ELSP catalog lists 500 A minimum interrupting capacity for its 15.5 kV, 125 A entry. The 125 A continuous rating and 500 A interrupting minimum are different ratings. This example describes Eaton data, not a Zeeyi product rating or an interchangeability claim. Check the exact catalog number and all table notes in Eaton CA132013EN.

When TCC Curves Need I²t and Peak Let-Through Data

In the current-limiting region, the fuse restricts the fault waveform. A time-current overlay alone cannot describe every aspect of that interruption. Keep these three checks separate:

DataQuestion it answers
Time-current characteristicHow does operating time vary with current under the stated conditions?
Peak let-through characteristicWhat peak current passes during the specified fault condition?
Minimum melting and total clearing I²tWhat current-squared time integral applies before melting or through interruption?

I²t is expressed in A²s; it is not an energy value in joules by itself. Use manufacturer data at the applicable voltage and conditions. For fuse-to-fuse selectivity in the current-limiting region, the upstream minimum melting I²t must exceed the downstream total clearing I²t with the manufacturer’s required allowance. Confirm the approved combination rather than relying on a curve intersection or ampere-rating ratio alone. See Eaton’s medium-voltage fuse application guidance.

There is no universal 0.1–0.2 second margin for all current-limiting fuse combinations. Likewise, a generic millisecond clearing time or fixed peak-current reduction cannot replace the selected fuse’s published characteristics.

Coordinating a Bay-O-Net Fuse with a Backup Current-Limiting Fuse

In a coordinated series arrangement, the Bay-O-Net fuse handles the intended lower-current duty while the backup current-limiting fuse provides high-fault protection. Select the pair as a protection system. Verify low-current coverage, the transition between devices, transformer inrush withstand, and the maximum available fault current.

Use the manufacturer’s pairing tables and their conditions for transformer voltage, capacity and fuse-link type. The backup fuse is intended to operate for severe faults, so keeping it intact for every possible fault is not the goal. Our Bay-O-Net and current-limiting fuse coordination guide explains the division of protection duties.

Common TCC Reading Errors to Avoid

ErrorBetter check
Using a curve from a similar fuseMatch the complete catalog number and curve revision.
Reading minimum melt as completed interruptionUse total clearing for the device expected to clear the fault.
Treating a curve endpoint as an interrupting ratingRead the separate minimum and maximum interrupting ratings.
Applying one generic inrush multipleUse transformer-specific inrush information and the applicable selection guidance.
Ignoring installation temperature or prior loadRequest the manufacturer’s temperature and preload corrections.
Treating a conceptual drawing as test dataUse traceable manufacturer curves or tabulated data for the study.

Fuse Curve Data Checklist for an RFQ

Send the supplier the transformer kVA, primary and secondary voltages, winding connection, operating frequency, installation medium, expected load and available fault-current range. Identify the companion fuse, relay or recloser, including its settings where relevant.

Request a document package containing the proposed catalog number; voltage and continuous-current ratings; minimum and maximum interrupting ratings; minimum melting and total clearing curves; reference temperature and preload conditions; peak let-through and I²t data; recommended companion devices; and the applicable curve revisions. Ask for digital curve points when available for your coordination software.

Record which documents were used and which assumptions still need confirmation before approving a substitution. A product photo or nameplate rating does not establish coordination. When enquiring about our current-limiting fuses, include this information so the required model documentation and application suitability can be confirmed.

Frequently Asked Questions

What is a TCC curve in fuse protection?

A time-current characteristic curve relates current to fuse operating time. Read the legend to identify minimum melting and total clearing curves, their units, and their reference conditions.

What is the difference between minimum melt and total clearing time?

Minimum melting identifies the earliest melting boundary under the stated conditions. Total clearing includes melting and arcing through complete interruption. Use the correct boundary for each coordination check.

How fast does a current-limiting fuse interrupt a fault?

In its current-limiting region, a fuse can interrupt in less than a power-frequency cycle. Actual performance depends on the fuse and circuit; use its published clearing, peak let-through and I²t data rather than a universal millisecond value.

Is minimum interrupting current the same as the current-limiting threshold?

No. Minimum interrupting current is the lower boundary of the specified interrupting range. The current-limiting threshold concerns limiting the prospective current peak. A backup fuse needs coordinated low-current protection below its interrupting range.

Can two current-limiting fuses be coordinated using TCC curves alone?

Not throughout the current-limiting region. Check manufacturer coordination tables and applicable minimum melting and total clearing I²t data as well as TCC curves. Use the required margins and application conditions for the exact devices.

What information should I request with a fuse TCC curve?

Request the catalog number, curve revision, voltage and current ratings, minimum and maximum interrupting ratings, minimum melting and total clearing curves, temperature and preload basis, peak let-through data, I²t data, and recommended companion devices.

How does temperature affect a fuse coordination study?

Ambient or oil temperature, enclosure conditions and prior loading can affect fuse behavior. Apply the manufacturer’s corrections for the actual installation; do not shift every curve by a generic temperature factor.